The project consists of building two faculties, ‘Polytech’ and ‘Health’, with a 13,200 m² of built-up area, distributed on two underground floors (parking and technical rooms), a ground floor (lobby and auditorium), and five upper floors (administrative, laboratories, and classes).
The project consists of building two faculties, ‘Polytech’ and ‘Health’, with a 13,200 m² of built-up area, distributed on two underground floors (parking and technical rooms), a ground floor (lobby and auditorium), and five upper floors (administrative, laboratories, and classes). It is an extension to the existing Sagesse St. Paul University.
Location
Beirut, Lebanon
Client
Maronite Archdiocese of Beirut
Consultant
4b Architects
Built Up Area
13,000 m²
Project Duration
18 months